Having lined two of the three boreholes, the next stage was to raise the water to the surface, and bring it to a place where it is useful. One borehole would supply the house itself, and the other borehole would fill the south charca (storage pond) nearer to the house for later use in irrigation. It also has connections to the spring, to the orange orchard/vineyard, and to the tank near the house. We had two estimates for the project of bringing power and water to the house, and decided on a flexible system in which both boreholes can supply domestic water, and the lower (irrigation) borehole is pumped by a solar photovoltaic system. This means that on sunny days when water is most needed, the sun would pump it out of the ground.

Paulo the engineer and I got on well together, and he quickly understood what was needed.  In April 08, as soon as the weather was dry they started work on the 4feet-deep trench linking the lower furo (borehole) and the electric connection board to the house over 200 metres away.

On the satellite photo the red line denotes the limits of our land, green lines are the perimeter of olive grove (olival) areas, and orange is a vineyard with orange trees.  The dark yellow line is for electricity, and blue for the water pipe.

At the same time he put a mains electricity water-pump into the domestic borehole, and linked both lines in the garage via an H- system. This should allow us to choose either of the boreholes to supply the house.  Every day, he brought a big bag of bread rolls, some beers and meat to barbecue; Janet made salad and I cooked the sausages and steaks for lunch, which we all ate together on the patio in the sunshine.

On the second day of work (Friday), they arrived before 8am and asked if they could use my tractor to fill in the trench and level the ground as the tubing was laid. They clearly enjoyed working for us, carrying on into the dark, and finishing at 9pm – so much for the week-end starting on Friday lunchtime!

Lowering the pump, its water-level sensors and electrical supply line into the 100metres deep well.

They worked all day Saturday and two hours on Sunday morning too. In return for the loan of my tractor, they wired lights and a power point into the house. The end of an era; until now, lighting was by candles, storm lamp and an Aladdin No23 paraffin lamp -a luxury to read by, but so much work . . .

View northwards to the house, all the tubes buried and trench filled.

By Tuesday the guys had connected both the water and electrical systems, and we now have our own granite-filtered water from the house furo, supplied to a tap in the garage. The granite house has no plumbing so we have to go to the garage for water, which is an improvement on trailing into the village with two ten-litre containers and filling them at the village hand pump.  At this stage (May08) the lower furo still has no pump.